Appendices

2-1           EIAR Scoping Exercise Reponses

2-2          Strategic Infrastructure Development Determination Letter

2-3          Community Report

2-4          Consideration of Replanting

4-1          Site Layout Drawings

4-2          Peat and Spoil Managaement Plan

4-3          Construction and Enviornmental Management Plan

4-4          Surface Water Management Plan

4-5          Glenora Wind Farm 110kV Grid Connection - Construction Methodology

4-6          Glenora South Wind Farm 110kV Grid Connection - Detailed Drawings

4-7          Decommissioning Plan

4-8         Glenora Wind Farm Recreation Report

5-1          Wind Farms & Health Literature Review - Chapman 2015

5-2          House Prices Study - CXC Scotland 2016

6-1          Botanical Survey Report

6-2          Bat Report

6-3          Aquatic Baseline Report

6-4         CONFIDENTIAL Potential Badger Sett Locations

6-5         CONFIDENTIAL Potential Otter Holt Location

6-6         Biodiversity Management and Enhancement Plan

7-1          Bird Impact Assessment Report - Malachy Walsh & Partners

8-1          Geotechnical and Peat Stability Assessment Report

9-1          Flood Risk Assessment Report

9-2          Drainage Design Calculations

9-3          Water Framework Directive Assessment Report

11-1         Carbon Loss Calculation

12-1        Construction Noise Report

12-2        Operational Noise Report

13-1         Photographic Record

13-2        Ceide Fields Viewpoint Wireline

14-1        Landscape and Visual Impact Assessment Methodology

14-2        Landscape Character Assessment

14-3        Photomontage (Viewpoint) Assessment

14-4        Landscape and Visual Impact Baseline Map

15-1         Autotrack Assessment

15-2        Construction Traffic Management Plan